|
|
|||
Golden Sunoperation complies with ISO9001 instruction and requirements, We use advanced measuring facilities and well-constructed quality control system to control every process of design, production and quality check efficiently. We define quality as total customer satisfaction. After the mould design is over, the CAD data is received the mould is manufactured, moulded, tested and inspected using in-house Co-ordinate Measuring Machines (CMM),electronic height gauge, electronic gauge etc, All of these activities are carried out in our factory to strict quality control guidelines by our experienced staff to ensure they meet our customers' specific requirements.. MAIN QC PROCEDURE 1.Mould Steel Hardness、Dimension Inspection 2.Mould Electrodes Inspection 3.Mould Parts Dimension Inspection 4.Mould Pre-Assembly Inspection 5.Mould Trial Report and Samples Inspection 6.Mould Shipment Final Inspection Tooling: |